The article presents the specificity of designing district heating substation (DHS) cooperating with the air heating
system in the air conditioning systems of hospital operating blocks. The following specific problems are highlighted:
selection of heat exchangers according to the heat power balance in the context of the use of heat exchangers with
high-efficiency heat recovery in ventialion and air conditioning systems, selection of the elements of the DHS, taking
into account significant and rapid changes in heat power demand, protection of the air heating installation and the
DHS against jumps of operating parameters, selection of the correct power supply scheme for heaters and control
elements from the point of view of the precision of air parameters and from the point of view of the proper functioning
of the DHS, protection of the air heating installation against the influence of low ambient temperature. The conditions
that should be met not only by the heat substation, but also by the air conditioning installation are given.
Keywords:
About Authors:
dr inż. Kazimierz Żarski – niezależny ekspert HVAC; dr inż. Mariusz Kryża, https://orcid.org/0000-0002-3819-0896 – Politechnika
Bydgoska, Wydział Budownictwa, Architektury i Inżynierii Środowiska. Corresponding Authors: k_zarski@ic.torun.pl, mariusz.kryza@pbs.edu.pl